Paint that lives well in Dhaka weather
Home | Office | Industrial | Gulshan 2
Smart Paint Home specifies coatings for Dhaka apartments, corporate floors, and factory sheds. We start in Gulshan with a colour visit, then write a BDT quote that names the system, the coats, the drying windows, and the building access hours you actually have.
Monsoon humidity, generator soot, and balcony sun punish cheap emulsions. We choose primers, sealers, and topcoats that stay washable after a year of ceiling fans and Friday cooking. Drop cloths, shoe covers, and a labelled leftover tin are part of every close out.
Same week slots cover interior refreshes. Exterior elevations and industrial shutdowns are booked around weather and production calendars so you are not waiting on a scaffold with wet film in the rain.
Three studios in one crew
One Gulshan desk coordinates colour, access, and safety so your home, your office, and your plant do not get three conflicting schedules.
Apartments, duplexes, and villas. Interiors, exteriors, ceilings, doors, and balconies specified for family wear, cooking steam, and Dhaka dust.
Fit outs, corridors, receptions, and after hours floors. Low odour systems so staff return Monday without a chemical hangover.
Sheds, plant rooms, steel, and epoxy floors. Shutdown windows, safety briefings, and coatings that survive heat, oil, and forklift traffic.
Full catalogue
Scroll the catalogue, then book a visit. We will tell you which items belong on your substrate and which would fail in six months of Gulshan humidity.
Washable walls for bedrooms, living rooms, and kids rooms. We cut in ceilings, mask switches, and leave edges that look factory finished.
Elevations that face rain, sun, and generator soot. Elastomeric options for hairline cracks common in Dhaka RCC.
Enamels and PU systems for teak, particle board, MS grills, and aluminium that people actually touch every day.
Ceiling maps, bathroom splash zones, and terrace coats after the leak is diagnosed, not painted over as a cosmetic lie.
Venetian, sand, and colour blocking for Gulshan living rooms and brand walls in offices that need a signature, not another beige.
Floor builds, line marking, and steel primers scheduled around production so you are not shutting a line twice.
How a job actually runs
Every paid job passes these gates. If weather or access blocks a gate, we tell you the same day instead of stretching a three day interior into a two week rumour.
A colour lead walks the site with a moisture meter, notes building rules, and photographs elevations. You get a written BDT quote with coat counts, not a verbal maybe.
A4 boards or a patch on the actual wall. We check the shade in afternoon Gulshan light because north facing rooms lie on paper swatches.
Furniture shifted, floors covered, cracks opened, primers dried. Coats go on only when the substrate is ready. Rushing the first coat is how peeling starts.
Walkthrough with you or your building manager. Leftover tins labelled by room. A snag window so hairline misses get fixed without another full mobilisation.
Prep is the product
Dhaka walls hide distemper, lime wash, seepage maps, and patchy putty from the last tenant. We scrape what fails a tape test, seal stains, and rebuild edges around AC trunks and false ceiling beads.
On exteriors we wash algae, open cracks, and choose elastomeric or cementitious systems based on movement, not based on whichever tin is cheapest this week in the market.
Industrial floors get grinding, moisture checks, and primer windows written into the shutdown plan. A pretty topcoat on a greasy slab is a warranty we refuse to sign.
Where the vans actually go
Crews launch from Gulshan 2 and run daily routes across north and central Dhaka. If you are further out, ask. We will quote travel honestly instead of padding a silent hour into the labour line.
Building access in this city is half the job. We coordinate with security, lift bookings, and Friday closures so your neighbours are not trapped in a stairwell full of wet enamel.
Duplexes, serviced apartments, and embassy adjacent buildings with strict lift and quiet hours.
Family homes and diplomatic compounds that need low odour interiors and tidy exteriors.
New flats with first paint after handover and villas that need elevation refresh after monsoon.
Corporate floors after hours and factory sheds booked around production calendars.
Older walk ups with damp maps, shared stairwells, and careful neighbour management.
Sector homes and showrooms that want a consistent brand colour across multiple units.
Voices from the rooms we finished
These are composite portraits of the jobs we run every month in Gulshan and across Dhaka. The pattern is the same: sample first, quote in writing, leave labelled tins.
Colour stories
They sampled three greens on the actual living room wall at 4pm. The one we loved on paper looked cheap in our light. That visit saved a whole floor of regret.
Colour stories
The crew started Friday night and handed back Monday 7am. No complaints from the next floor. The reception green matches our brand deck, not a close enough guess.
Colour stories
Previous painters had painted over a wet patch. Smart Paint Home traced the leak first, then coated. Six months later the ceiling is still clean.
Colour stories
Epoxy on a shutdown weekend, line marking Monday before first shift. They treated the floor like a production asset, not a cosmetic extra.
Colour stories
Exteriors after last monsoon were streaked. The new elastomeric coat still looks even after this season. Security liked that the scaffold came down on the promised day.
Colour stories
Written quote in BDT, no cash drama, leftover tins labelled by room. That is rarer in this city than a perfect cut line.
What goes on the wall
We specify primers and finishes from brands that publish data sheets, then we still check batch numbers on site. If a client has a preferred brand already in the building store, we can work with it after a adhesion test.
Interior families include washable emulsions, stain blockers, and low odour options for occupied apartments. Exterior families include acrylics and elastomerics rated for tropical rain. Industrial families include alkyds, epoxies, and PU where chemical resistance matters.
You will see the product names on the quote. If a cheaper substitute appears on site, you have the paper to stop the job. That is the point of a specification, not a decoration.
Why Gulshan clients keep the number
Seepage, salt, and failed putty get named. Painting over a wet map is a refund we would rather not owe you.
Labour, materials, access, and snag window on one page. Variations are written, not whispered on the last day.
Exteriors do not start when a storm cell sits on Gulshan. We move the day, we do not gamble a facade.
Landlords, tenants, and security get the same plan. Misheard instructions are how overspray happens.
Touch up tins stay with you, marked by room. Future scratches should not require a full crew.
A documented return visit. Hairline misses and door edges are finished, not argued.
Questions we hear on every visit
Interiors of two to four rooms usually fit inside two weeks if access is clear. Full flats, exteriors, and occupied offices need a site visit first. Peak season before Eid and after monsoon fills fast, so send photos early even if the date is flexible.
Yes, room by room. We seal doorways, run low odour systems when needed, and keep a path to the kitchen and one bathroom. You should expect furniture moving and a few days of disrupted rooms. We will not pretend it is invisible.
We can get close with on wall samples. Printed decks and phone photos lie. We always lock colour on the actual wall in afternoon light before buying the full volume.
We do not sell a pretty lie. If moisture is active we pause coating, tell you who needs to fix the source, then return with stain blockers and the right finish. Waterproofing without a dry substrate fails.
Quotes are in BDT and list what is in and what is out: scaffolding, furniture moving, parking, after hours premiums, and extra coats if the old colour is a strong red or yellow.
That is a standard product. We brief security, isolate HVAC if needed, and hand back before staff arrive. Odour and drying times are part of the written plan.
Ready when the wall is ready
Send a photo of the room or elevation, your preferred dates, and whether people will be living or working in the space. We reply with a visit slot and a first pass of what the system might be.
After the last coat
Workmanship coverage covers peeling caused by our prep or application, not new leaks, structural movement, or someone washing the wall with a harsh solvent the next week.
You receive a simple care note: wait times before cleaning, which cloth to use, and which leftover tin belongs to which room. If a snag appears inside the agreed window, we return without turning it into a new sales visit.
Industrial floors and exterior elastomerics carry conditions about traffic, chemical spill, and rain during cure. Those conditions are on the quote so both sides know the edges of the promise.
Plant and warehouse
Tejgaon, Tongi, and Savar managers call us when a cosmetic contractor treated a factory like a living room. We write method statements, toolbox talks, and coat windows that match your shift pattern.
Steel gets the primer it needs. Floors get the grind they need. Line marking happens after cure, not while forklifts are still inventing shortcuts through wet epoxy.
If your HSE team needs SDS packs and a named supervisor, say so on the first call. We would rather bring the paperwork than lose a night to a gate that will not open.
Corporate floors
Reception greens, meeting room calm, and corridor durability are three different products. We do not paint a whole floor with one interior emulsion because it was on sale.
After hours work includes lift bookings, security badges, and a plan for odour. Your team should walk in to colour, not to a chemical story they have to explain to clients.
Multi floor rollouts across Gulshan and Motijheel get a shared specification so the fifth floor does not secretly become a different green.
From Gulshan 2 to the rest of the city
Smart Paint Home | House 18, Road 53, Gulshan 2, Dhaka 1212, Bangladesh | +880 1711 882 441 | info@smartpainthome.com
Saturday to Thursday 8:00 AM to 8:00 PM. Friday 9:00 AM to 2:00 PM. WhatsApp a photo if you want a faster first read before the visit.